Project TIES: Architecting High-Level Training Evaluation

A Performance System Case Study

Amazon Delivery Central Operations

Executive Summary

Problem: L&D lacked a system to gather Level 3/4 data, leading to costly retraining and decisions based on associate anecdotes.

Solution: Architected Project TIES, an end-to-end training evaluation system using Python, Slack APIs, Asana, and AI-powered reporting.

Impact: Increased survey participation by 56% (from 44.49% to 69.17%) by migrating the system from VBA/Outlook to Python/Slack. Identified critical performance gaps: the data revealed that 20% of department SOPs were outdated, shifting the L&D focus from content revision to systemic process improvement. Validated training effectiveness: confirmed that 81% of participants frequently apply their learned skills.

The Problem

L&D could count training but could not see its effect. The only data available was training counts, requested, pending, assigned, and completed, plus trainer performance. Nothing captured whether associates could do the work a month later, so gaps surfaced as anecdotes and the default response was more training.

  • Training counts: requested, pending, assigned, completed
  • Trainer performance
  • No Level 3 behavior data
  • No Level 4 results data

Goals

Goals were set against Gilbert's Behavioral Engineering Model, so the analysis could separate what people lacked from what the environment failed to provide.

Discover Performance Gaps

Compare actual task execution against expected task execution.

Find Root Causes

Distinguish knowledge and skill gaps from information, resource, and incentive gaps.

Improve the Program

Feed evidence back into what L&D builds and revises.

System Design

Five components, with a human review step before anything reached a senior leader.

TIES Application

Sent initial and escalation outreach, logged sent and error states, linked directly to the relevant SOP, and routed feedback to the SOP creator. Accessibility was built in: keyboard navigation, contrasting colors, alt text on hover, a progress bar, and error pop-ups.

Slack

Delivered surveys and logged sent and received messages.

Asana

Stored submissions, tracked outreach and metrics, and drove the associate and manager dashboards.

TIES CSV Analyzer

Analyzed the survey data exported from Asana.

Outlook Reporting

Sent AI-generated reports to senior leaders by department, filtered by month and year. L&D reviewed and revised every report before it went out.

Decision: Moving From Outlook to Slack

V1 ran on VBA with the Outlook API. V3 ran on Python with Slack webhooks and Asana. The switch was made on data, not preference: engagement was measurably higher in Slack than in Outlook, and VBA could not support the accessibility requirements or the interface quality the workflow needed. Participation after the migration confirmed it.

V1   VBA + Outlook APIV3   Python + Slack webhooks + Asana

Results

Measured

88%

Felt confident working in-process one month after training.

Measured

81%

Frequently applied the skills they learned.

Measured

85%

Felt supported by their manager and team.

Measured

5%

Reported dissatisfaction.

Measured

44.49% to 69.17%

Survey participation after the move from Outlook to Slack, a 56% increase.

Measured

20%

Of department SOPs were flagged out of date.

Measured

80+ hrs

Of manual reporting eliminated per quarter, per teammate.

Estimated

~$50K / year

Estimated labor savings, calculated as time multiplied by loaded rate. This is an estimate, not a measured finance figure.

Sentiment Analysis

Thirty-nine open responses were coded for sentiment.

Measured

33%

Positive

Measured

62%

Neutral

Measured

5%

Negative

Themes

What It Changed

The data confirms that over 85% of participants are confident to work in-process one month post-training, apply the skills they learned during training, and feel supported by their manager and team.

However, the data highlights that outdated SOPs and sentiment analysis themes (more hands-on training and outdated training materials) shift the focus from improving L&D content to systemic process improvement: bureaucratic approval processes, pro-active SOP updates, and timely material update requests from leaders.

Barriers and Trade-Offs

Leader Approval

Getting sign-off to survey associates and report upward took longer than the build.

API and Permission Limits

Asana and Slack API access and permission scopes constrained what could be automated.

Team Buy-In

Adoption required the L&D team to change how they reported, not just what tool they opened.

Human in the Loop

Full automation was possible only with wider API access, so reports were generated then reviewed and revised by L&D before sending. I worked with SDEs and data scientists on the tool choices.

Timeline

2 months

Planning and development of the application.

1 week

Slack integration.

2 weeks

Asana projects, rules, and integration.

The system then ran for 5 months in production.

The Original Deck

The internal case-study deck as presented.

Open the Slides in a New Tab

More systems, and the learning experiences behind them.

or write directly to brent.michael670@gmail.com